Plan a dry-docking from specification to yard quote
Build the docking specification, send it to the yards, compare what comes back, and follow the cost and the timeline of the project.
Build the specification as a tree of items by SFI group, with details and files on each item.
Put price details on each item and follow the costs of the project.
Send the specification to several yards as an inquiry, with an Excel sheet to fill in and read back.
Compare the yard quotes side by side, keep a short list, and select the yard.
See the docking on a timeline with events along the way, and an overview of the whole project.
Print the specification and job sheets as PDF, and reuse a docking as a template or copy it for the next one.
Once the specification is final it can be locked, so what the yards quote on is what you check afterwards. Orders and predefined jobs link into the project, and jobs that cannot wait can be postponed to the project.
Real-time fleet overview with live telemetry and fleet-wide KPIs
SFI-based classification for all ship components
Vessel-specific allocation with stock monitoring
Track certificates with expiry alerts
Advanced analytics with dashboards
Procurement workflow from requisition to PO
Plan voyages with port calls, cargo and fuel
Crew records, certificates, availability and hours of rest
Plan a dry-docking from specification to yard quote
Cargo manifests for every voyage
Medical stock, kits and inspections
Move equipment between vessels and keep its history
Checked running-hours counters that drive maintenance
Incidents, inspections and corrective actions
A document library with versions and approval
Class surveys, findings and requirements
Can the vessel sail? The status and what blocks it
Role-based access control
Book a demo or request free access. No credit card required.